Chief Minister Siddaramaiah Inspecting Roads throughout his Metropolis rounds in Bengaluru on Saturday. , Photograph Credit score: Particular Association
After his Authorities Facted Public outrage and a Social Media Backlash, Chief Minister Siddaramaiah Performed Metropolis Rounds on Saturday to Examine Roads and Camels and Got here Engineers, Contractors, and Civic Officers Over Pothole-Ridden Roads, Unattended Waste, and Dereliction of Obligation.
Visibly upset over the poor state of stable waste administration, Mr. Siddaramaiah Directed Chief Secretary Shalini Rajneesh to Subject A Discover to Raghavendra Prasad, Chief Engineer of Bengaluru Stable Waste Administration Ltd. (BSWML). The Directive Got here after he Visited Ward Quantity 23’s Stable Waste Assortment Heart, the place he discovered rubbish strewn outstide regardless of ample area inside.
With Potholes Multipling in the course of the monsoon, the Chief Minister Gave Civic Company A One-month Deadline to Restore Roads and Make them Motorable. He harassed that Pothole filling have to be carried out with lasting high quality, not by short-term patchwork.
Inspects Key Roads
Mr. Siddaramaiah Started His Inspection at Windsor Manor Bridge and Coated Hennur-Bagalur Street, Bennaiganhali Flyover, Outdated Madras Street, Panathur Street, and KaadubeEsanhahali, with Asphalting Works. He impressed potholes alongside the stretch from iblur Junction to Silk Board Junction.
At Panathur T-Cross, The Chief Minister Seen Massive Heaps of Building Particles Dumped Alongside The Street Ordering CCTV Digicam Set up and Deployment of BBMP Marshals, He Directed The Police Commissioner and the Company Commissioner to take Strint Motion Towards Offenders Resainst Offenders Resainst for Allegal Dumping.
Within the hennur-bagalur division, Mr. Siddaramaiah Ordered the Suspension of an government engineer after discovering that POTHOLES WERE SEAN FILLED With Jelly Stones INTEAD of Correct asphalt. He warned that such negligence wouldn’t be tolerated.
On Hennur Street, the place white-to-tooping is in program, he insisted With the federal government spending ₹ 13 Crore Per Kilometre on the 5-km Stretch, He Gave the Contractor One Month to End the work and make sure the roads have been freed from potholes.
Metro-Associated Injury
Elevating Issues about Metro Building Works, The Chief Minister Famous that Negleted Service Roads, Blocked Drains, and Water Stagnation Had Broken Freshly White-Toppeed Stretches. He Directed Rapid Repairs and Correct Maintenance of Service Roads.
At one level alongside the ring street, recognizing previous development particles dumped in space with out cctv protection, Mr. Siddaramaiah Stopped His Convoy and Instructed Officers to Hint The offenders, Seize Their Automobiles, and File Instances. Angrily Questioning Civic and Site visitors Officers, He Requested, “Do you stroll Across the Metropolis along with your eyes shut? Are you able to not see you not see waste being dumped on the street?”
Concluding His Inspection, Mr. Siddaramaiah Issued a Stern Warning that Engineers, Contractors, and Commissioners would straight accountable for lapses in street upkeep, pothole filling, and waste managment.
Revealed – September 27, 2025 10:27 pm IST
