Reduction for Bengaluru commuters as Silk Board flyover set to open totally, however new bottleneck looms


A view of the double decker flyover close to Silk Board in Bengaluru on April 10, 2026. | Picture Credit score: ALLEN EGENUSE J

Bengaluru’s first double-decker flyover within the southern a part of town is lastly able to be totally operational, however an inspection by the Bengaluru Site visitors Police (BTP) has revealed a possible bottleneck on the first junction (Aravind Junction) after the top of the down ramp close to Ragigudda.

Now, the BTP has deliberate interventions reminiscent of growing sign move time and shutting two left turns after the down ramp throughout peak hours, amongst others, to sort out the scenario.