Mumbai Metro Line-3: PM Modi inaugurates Section 2B – Examine Aqua Line route, fares, timings and different particulars


As Mumbai’s first and solely absolutely underground metro line, Section 2B of the Mumbai Metro Line-3 is about to redefine commuting throughout the Mumbai Metropolitan Area (MMR).

Mumbai:

Prime Minister Narendra Modi on Wednesday  inaugurated Section 2B of the Mumbai Metro Line-3, stretching from Acharya Atre Chowk to Cuffe Parade. The challenge has been constructed at a price of Rs 12,200 crore. He additionally launched the Mumbai One app, which affords commuters a variety of advantages, together with built-in cellular ticketing throughout a number of public transport operators. As Mumbai’s first and solely absolutely underground metro line, this challenge is about to redefine commuting throughout the Mumbai Metropolitan Area (MMR), providing a quicker, extra environment friendly, and trendy transit answer for hundreds of thousands of residents.

“Section 2B of the Mumbai Metro Line-3 is a major enhancement to Mumbai’s infrastructure! Metro connectivity is important for a metropolis’s development. This challenge can have a constructive impression on the lives of the folks of Mumbai,” PM Modi mentioned in a put up on X. 

Mumbai Metro Line-3 Section 2B Particulars

  • Complete Challenge Price: Your complete Mumbai Metro Line 3 challenge has a complete value of roughly Rs 37,270 crore.
  • Ultimate Stretch Price: Section 2B was constructed at a price of round Rs 12,200 crore. 

Mumbai Metro Line-3 Phases Accomplished

Section 1: Aarey JVLR – BKC (Inaugurated on October 7, 2024).

Section 2: BKC – Acharya Atre Chowk (Opened on Might 10, 2025).

Section 2B: Acharya Atre Chowk – Cuffe Parade (Completes the hall).

Mumbai Metro Line-3: Timings and Capability

  • Common Providers Begin: Common providers will start on September 15, 2025.
  • Timings: Trains will run from 5:55 am to 10:30 pm.
  • Route for Preliminary Service: Providers will initially run between Aarey JVLR and Acharya Atre Chowk.
  • Commuter Capability: As soon as absolutely operational, the Aqua Line is predicted to serve round 13 lakh passengers each day.
  • Journey Time Discount: It is going to lower journey time from Cuffe Parade to Aarey JVLR to only one hour, in comparison with the present 1–2 hours by highway.

Mumbai Metro Line-3: Fare

Distance Vary Fare
As much as 3 km Rs 10
3 km to 12 km Rs 20
12 km to 18 km Rs 30
18 km to 24 km Rs 40
24 km to 30 km Rs 50
30 km to 36 km Rs 60

Mumbai Metro Line-3: Key Connectivity and Advantages

The Aqua Line will join seamlessly with:

  • Central Railway at CSMT (Chhatrapati Shivaji Maharaj Terminus).
  • Western Railway at Mumbai Central and Churchgate.
  • The road will present direct Metro entry to Chhatrapati Shivaji Maharaj Worldwide Airport from South Mumbai.

Mumbai Metro Line-3: Mumbai One App

Mumbai One App affords commuters a variety of advantages, together with built-in cellular ticketing throughout a number of Public Transport Operators, elimination of queuing by selling digital transactions, and seamless multi-modal connectivity by means of a single dynamic ticket for journeys involving a number of transport modes.

It additionally gives real-time journey updates on delays, various routes, and estimated arrival instances, together with map-based info on close by stations, points of interest, and factors of curiosity, and an SOS function to make sure commuter security.

With PTI inputs