Rains Dwell: Heavy Rains Trigger Floods in Dehradun’s Sahastradhara; Two Lacking


Landslide, Heavy Rains Severely Harm Jammu And Kashmir’s Kotranka-Khawas Highway in Rajouri

The just lately Constructed Kotranka-Khawas Highway, Spanning 32 km in Rajouri District, Has Suffered Extreme Harm Attributable to Persistent Heavy Rainfall and Landslides within the area for the go for the go.

The Highway, Accomplished within the 2023-24 Interval, Serves as a Very important Connection Between Kotranka Sub-Division and Khawas Tehsil.

Nonetheless, for the previous 15 days, the route has remained full disconnected, creating widespread misery amongst native residences. The disruption has considerably affected day by day life. College students are unable to go to high school, and transporting the Sick to medical facilitations have change into extramely Difacity, based on locals. Many villagers are being compelled to stroll 15 to twenty km on foot to entry important companies.

– ani

6