Mumbai hearth: The Mumbai Fireplace Brigade raised the alarm to Stage II at 3:49 pm, deploying extra hearth engines and help models. Officers confirmed the flames had been largely contained to closed rooms overlaying 600 sq. ft. on the twelfth ground, however smoke unfold upwards, affecting higher tales of the tower.
A hearth broke out on Sunday afternoon at a high-rise residential constructing in Goregaon East, Mumbai, prompting a fast response from the Mumbai Fireplace Brigade (MFB). Happily, no accidents or casualties have been reported to date. The blaze was reported at 3:33 pm on August 24, at Vaishnav Heights Constructing on Rani Sati Marg, reverse Balaji Hospital in Goregaon (East). The hearth initially broke out in a closed room on the eleventh ground of the 22-storey tower.
By 3:49 pm, the Mumbai Fireplace Brigade categorized it as a Stage II hearth, indicating a moderate-level blaze requiring extra firefighting assets. Later, officers confirmed the blaze had unfold and was confined to round 600 sq. ft. of closed rooms on the twelfth ground, with heavy smoke logging on higher flooring.
Emergency response mobilised
A swift response was launched with deployment of-
- 7 hearth engines
- 1 turntable ladder (TTL)
- 1 high-pressure van
- 2 superior water tenders
- 4 jumbo water tankers
- 1 respiration equipment (BA) van
- 1 fast response automobile (QRV)
Senior hearth officers, together with the Deputy Fireplace Officer (DFO) and Assistant Divisional Fireplace Officers (ADFOs), supervised the operation. Along with the fireplace brigade, different companies like BMC’s ward workers, native police, PWD, Adani Electrical energy, and 108 ambulance companies had been additionally mobilised on website.
Trigger underneath investigation
Whereas the blaze has been introduced underneath management, the precise reason behind the fireplace stays unknown. Officers are at the moment investigating whether or not {an electrical} short-circuit or every other fault might have triggered the incident.
No casualties reported
As of the most recent replace by 4:03 pm, no accidents or casualties have been reported. Evacuation of residents and smoke clearance from the higher flooring of the constructing are underway.

