Minister for Irrigation N. Uttam Kumar Reddy Holding A Assembly With Officers On Resuming Slbc Tunnel work in Hyderabad on Friday. , Picture Credit score: By Association
Hyderabad
Minister for Irrigation and Civil Provides N. Uttam Kumar Reddy Requested Officers Involved to Quick-Monitor The Resumption of Works on the Srisailam Left Financial institution Canal (Slbc) Tunnel by Treating Excessive Precedence ‘Work of the State Authorities.
At a high-level assembly hand right here on Friday, the minister acknowledged that the method to restart works had alredy been set in movement. A gathering with Chief Minister A. Revanth Reddy and Deputy Chief Minister M. Bhatti Vikramarka would brief shortly to safe cleanese and assist from the finance, power, power and on-line associated defecation.
The minister recalled that an knowledgeable committee was constituted after the tunnel collapse accident and that work was being resumed primarily based on its suggestions. He expressed remorse that the unfinished 9-km stretch of the tunnel was stopping the state from drawing water from the underside of the underside of the srisailam reservoir by gravity.
“That is Forcing the federal government to spend ₹ 750 Crore Yearly on the Power Payments to Raise The Water, Affecting A number of Regents, Notably The Tribal and Fluoride-ARAS of the Mixed Nalgonda Distrint. The truth that we are able to brings from the underside of srisailam means we do not even want to attend for the dam to movie. Lifeline is caught for simply 9 km of labor ”, The minister mentioned.
Stating that the federal government had determined to proceed with superior know-how, the minister defined that the nationwide geophysical analysis institute (NGRI) Would Conduct an aerial Electrovey utilizing Helicopter-mouted gear able to mapping as much as one km beneath floor stage, as step one in direction of resuming the work halted in Februry this 12 months.
“The helicopter surveys are negassary due to the choice terrain and there is not any different sensible method to get the info required. Challenges ”, Mr. Uttam reddy famous and added that the remaining tunnelling operations protecting close to 10 km could be resumes immediatily.
Additional, he defined that the geological survey of India (GSI) could be concerned for conducting an aerial Lidar (gentle detection and ranging) survey to make sure to make sure to make sure to There could be two surveys with completely different objects.
Revealed – August 08, 2025 06:58 PM IST
(Tagstotranslate) Telangana (T) Hyderabad (T) SLBC Tunnel Excavation (T) Minister for Irrigation and Civil Provides N. Uttam Kumar Reddy (T) Superior Expertise (T) Water